Two quotes lie on the desk of the buyer for a contract caterer with twelve kitchens in Ireland and the UK. The first offers 100,000 printed napkins in one delivery. The second offers the same quantity as a framework agreement over twelve months, in six call-offs, with the note “storage included”.

The unit price stands in both. It is not the question. The question is what sits inside the word “included”, and what happens when the fourth call-off does not come in July, because the kitchens have moved to a different napkin size.

In packaging procurement the framework agreement is the instrument with which large buyers make minimum runs bearable. It is not a discount on the minimum run and not a warehouse the supplier has given away. It is a two-stage promise: a total quantity that gets produced, and call-offs that bring it to you bit by bit. What must be settled in the first stage so that the second brings no surprises, we describe from the side of the plant that prints the quantity and keeps the pallets until they are needed.

What does the framework agreement settle, and what only the call-off?

The framework agreement settles the terms, the call-off triggers the delivery; only the call-off creates the duty to deliver and to pay. Legally it is an umbrella with individual contracts underneath: the framework carries item, specification, total quantity, term, conditions, quality requirements, storage and information duties and the clause for price adjustments. The call-off carries part quantity, delivery date and delivery address. What many drafts blur is who is bound by which stage. A framework without a commitment binds the supplier to price and capacity and the buyer to nothing; a framework with a total quantity binds both. For printed packaging the second is almost always what is meant, because the supplier produces the quantity in one go, and precisely that rarely stands in the text. UK public-sector frameworks work the other way round, with commitment only at call-off; a supply agreement for printed packaging borrows the vocabulary but not that mechanism.

From our experience with chains and caterers the robust framework has six lines that the call-off can no longer change: total quantity per version, term, minimum quantity per call-off, call-off cycle, storage location until call-off and the rule for the leftover. Everything else, dates, addresses, distribution across kitchens, belongs in the call-off, where it can be adjusted without amending the contract. Whoever has the six lines in the framework can trigger a call-off with an email. Whoever does not renegotiates the contract with every call-off.

Why does the supplier print the annual volume in one run?

Because tooling, make-ready and colour matching arise per production run and spread over the run length; six runs of one sixth each cost six make-readies. In flexo every run means mounting the plates, starting the press with start-up waste and matching colour against the press proof; in offset, setting plates and die. Those costs do not appear on the invoice as their own line, they sit in the unit price, and the unit price you see in the framework applies to one run over the total quantity. Whoever wants six small runs instead gets a different price or, more often, no quote. From the plant’s side the framework agreement is therefore not a delivery schedule but the permission to print the quantity before it is called off.

Our product page for paper napkins gives the minimum quantity by ply as 100,000 pieces single-ply printed and 50,000 pieces two-ply printed. That line is the number a framework agreement spreads, and the agreement does not change it. The 100,000 single-ply napkins in the buyer’s quote are printed in one run, whether they arrive in one delivery or in six. The difference lies in where the cartons stand between the run and consumption and who owns them meanwhile. For printed paper napkins that is the real question of the framework agreement, not the unit price.

Who stores, who pays, who bears the risk: three storage models

Three models are common, and each moves space, capital and risk to a different place. The first is call-off stock at the supplier: the total is produced, kept palletised at the plant or in its warehouse and delivered and invoiced with each call-off. The buyer ties up no capital, needs no space and waits for the transport time on each call-off. The second is consignment stock at the customer: the goods sit in your warehouse but remain the supplier’s property until you draw them; the draw is invoiced. You save the transport time and tie up no capital, but you need space, a draw report and a contract covering insurance, stocktaking and liability for damage. The third is your own central warehouse: you take the total, store it yourself and distribute to the kitchens.

“Storage included” in the buyer’s second quote is the first model, and the question she should ask is: for how long. A plant keeps pallets for the term of the agreement; what still sits there afterwards costs space, and space has a price that surfaces somewhere. Whether paper may sit for twelve months and what happens to a pallet parked beside a loading bay in summer is in our guide to minimum runs and storage; here one sentence suffices: pre-produced goods age, whoever’s warehouse they sit in, and the last part delivery therefore has a use-by date that belongs in the contract.

How many call-offs does a chain need, and which lead time applies per call-off?

As many as consumption, storage space and pack size add up to; and the lead time per call-off is transport time, not production time. The sum starts with the pack size. The product page for napkins gives the catalogue pack for the 240 by 240 mm size as 2,400 pieces single-ply or 4,800 pieces two-ply. So 100,000 single-ply napkins are 42 cartons, and the question is not how many napkins a kitchen uses a month but how many cartons fit in its store and how many cartons a pallet carries. A call-off should be in whole cartons and as far as possible in whole pallets; mixed pallets with several items are admitted in many logistics manuals only for remainders, because they cost more time at goods-in than they save in transport.

From the plant we see two typical patterns in chains. One is the monthly call-off, which creates twelve small deliveries and twelve goods-in checks; it suits operations without a central warehouse. The other is the quarterly call-off to a central warehouse that supplies the kitchens together with everything else; it suits everyone already running site deliveries. A cycle between the two usually comes from caution, not from need. The reorder point at which the next call-off is triggered follows the familiar formula: consumption during the lead time plus safety stock. For safety stock, hospitality operators often quote allowances of a fifth to two fifths of consumption during lead time; with a framework agreement and call-off stock the lead time is short, and the allowance may be too.

Two lead times stand in the contract: the production time to the first part delivery and the call-off time for every further one. Our product pages give the lead time for printed napkins as around 15 working days after artwork approval, for printed meal boxes and cups around 15 to 20 working days. That is the production time, and it applies once, for the run. After that the goods sit in call-off stock, and the lead time of a call-off is the time for picking and transport, counted in days and not in weeks. A framework agreement that names “15 working days” for every call-off is either copied from a template or means that the supplier produces per call-off, in which case it is not a framework with pre-production but a series of individual orders with all their make-ready costs. Artwork approval is the date the customer holds and most often underestimates: the production time runs from approval, not from signature, and a framework signed in January whose artwork is approved in March delivers the first pallet in April.

What happens to the leftover when the menu changes?

It stays ordered, falls due at the end of the term and then sits in your warehouse, unless the contract says otherwise. That is the line missing from most packaging frameworks, and the one whose absence costs most. Menus change. Kitchens close. One napkin size replaces another, and the pre-produced quantity is unmoved by any of it. Three rules are workable: a band for the total quantity within which you may call off less without consequence; a fixed date, usually after two thirds of the term, at which both sides review the leftover and either extend the term or take the balance; and a conversion of the leftover where that is technically possible, say neutral cartons that are labelled afterwards. What is not possible is converting printed goods. A napkin with the old design remains a napkin with the old design.

Two dates should be on your mind when you set the term, because they can affect pre-produced stock on the EU market. From 12 August 2028 a harmonised marking of material composition is foreseen on packaging; the date moves if the implementing acts come later, but whoever prints a large quantity in 2027 should reserve the space for it now. And from 1 January 2030 hospitality may no longer use single-use plastic packaging for consumption on the premises, which under the Commission’s guidance includes paper packaging with more than five per cent plastic. Whoever calls off before those dates has no problem; whoever has stock pre-produced beyond them has a leftover that may no longer go on the table. Seasonal goods and special editions sharpen this further, and our guide to planning seasonal packaging backwards shows why the shelf date and not the delivery date is the starting point there.

Price adjustment without a price: what a twelve-month contract rests on

A framework over twelve months needs a clause saying when and how the price may change; without one it changes only within narrow limits and then usually in dispute. Price adjustment clauses tie the price to an index or to demonstrated cost changes, for paper in particular, and set thresholds above which the adjustment is triggered, in both directions. We name no figures here, because every figure is a negotiation; we name the structure, because it is what goes missing: the reference measure, the threshold, the notice period, the notification and the right to leave the contract if an adjustment exceeds a second threshold. In paper contracts it is also usual that the customer gives the expected annual consumption and the price is oriented to it; whoever calls off far less shifts the basis of the price as well.

From a manufacturer’s side we say openly that a framework without a price clause is a risk the supplier prices in. A contract with a clear clause is cheaper for both sides than a contract that pretends paper prices do not exist. And a contract in which the clause stands but nobody knows the index is a contract the lawyers read at the first dispute.

What the framework must settle before the first pallet is printed

Twelve points that should be fixed before the first run; afterwards only the call-off can still change.

  • Item and specification with tolerances, per version, with the version status that applies to the total quantity.
  • Total quantity per version and the band within which less may be called off.
  • Term, start from artwork approval, date for reviewing the leftover.
  • Minimum quantity per call-off in whole cartons or pallets, call-off cycle, notice for a call-off.
  • Storage model: call-off stock, consignment stock or central warehouse, with location, conditions and maximum storage time.
  • Ownership, insurance and liability for the goods until call-off or until draw.
  • Production time to the first delivery and lead time per call-off, stated separately.
  • Price clause with reference measure, thresholds, notice periods and exit right.
  • Leftover: take, extend, convert, dispose, checked in that order.
  • Changes: who triggers a change of material, marking or design, who pays for it, what happens to the quantity already produced.
  • Documentation per delivery: data sheet, batch number, conformity documents, for imports the due-diligence reference number.
  • Tooling: ownership of cutting die and printing forms, storage, release.

The buyer took the second quote, but not as it came. “Storage included” became a line with storage time and storage conditions, six call-offs became four to the central warehouse, and the contract gained a date in autumn on which the leftover comes to the table. In July, when the kitchens changed, a third of the quantity still sat at the plant. The contract said what would happen to it, and nobody had to guess.

In short

  • A framework agreement is two-stage: it settles terms and total quantity, and only the call-off triggers delivery and payment; for printed packaging the total is usually produced in one run.
  • The minimum run per version stays, such as 100,000 pieces single-ply or 50,000 pieces two-ply for printed napkins; the agreement spreads it, it does not lower it.
  • Three storage models move space, capital and risk: call-off stock at the supplier, consignment stock at the customer with the supplier’s ownership until draw, or the customer’s own central warehouse.
  • Call-offs are planned in whole cartons and pallets; at 2,400 napkins per carton, 100,000 pieces are 42 cartons, and the reorder point follows from consumption during lead time plus safety stock.
  • The quantity not called off stays ordered; band, review date and conversion rule belong in the contract, as do the dates 12 August 2028 for material marking and 1 January 2030 for single-use plastic packaging consumed on the premises in the EU.
  • Production time, around 15 working days after artwork approval, applies once for the run; the lead time per call-off is the transport time from call-off stock and is stated separately in the contract.